|
|
|
|
|
Completed Projects
|
|
|
Kurdamir -Ujar highway construction |
|
Company has successfully completed 3 bridge passages on the "Kurdamir-Ujar highway construction (km 0 +000 - km 42 +056)" in 2009. 1. Bridge passage over Goychay canal (Lapse L = 15m + 15m, width is 14.5 m.) 2. Bridge passage on 15 GK collector (Lapse L = 16.5 m + 16.5 m, width is 14.5 m.) 3. Bridge passage over the Goychay river. (Lapse L = 18m +18 m +18 m +18, width is 14.5 m.)
In addition, 2 underground pedestrian passages (KM 17 +420 in length 20.8 m, height of 3 m, width of 4.4 m, and KM-30 +575 14.26 m in length , height 3 m, width of 4.4 m) on this project were constructed and utilized.
|
|
|
|
|
|
|