|
|
|
|
|
Completed Projects
|
|
|
Tovuz Bypass road construction |
|
Funded by "World Bank the Tovuz Bypass road construction has been successfully completed in 2009. The length of the road is 10.5 km, width of 7.5 m, the total width is 15 m. Soil fulfillments there are 700 000 m3, volume of asphalt fulfillments are 65 000 tons. In addition, along the way 4 bridge crossings and 350 p / m water pipes with different diameters have been installed.
|
|
|
|
|
|
|