|
|
|
|
|
Completed Projects
|
|
|
Sabirabad region, construction of the bridge over the Kura river in Javad village. |
|
Bridge length: 144 meters Width: 10.7 meters Length of the access roads to the bridge: 800 meters Width: 10 meters Asphalt affairs: 8000 m2 Soil affairs: 61 000 m3 Gravel layer of: 5300 m3 Granule layer: 1620 m3 Construction commenced: November 2011 Construction completed: October 2012 Employer: REP Sabirabad
|
|
|
|
|
|
|